NEW QUESTION # 198
What are the minimum requirements for a customer-supplied VDS in a VxRail deployment?
- A. 2 uplinks
Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN - B. 4 uplinks
Port groups for Discovery, Management, vMotion, and vSAN only - C. 2 uplinks
Port groups for Discovery, Management, vMotion, and vSAN - D. 4 uplinks
Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN
Answer: A
NEW QUESTION # 199
During the installation of a new VxRail cluster, where is System Time configured?
- A. iDRAC Settings > System Time
- B. System BIOS > Miscellaneous Settings
- C. iDRAC Settings > System Profile Settings
- D. System BIOS > System Information
Answer: B
NEW QUESTION # 200
Which URL is used to enter the planning information for a new VxRail Cluster deployment?
- A. https://vxrailconfiguration.dellemc.com
- B. https://www.dell.com/support/home/en-us/product-support/product/vxrail-s...
- C. https://dl.dell.com/downloads/DL90235_Network-Validation-Tool-for-VxRail...
- D. https://etools-acg.dell.com/vxrail
Answer: A
NEW QUESTION # 201
Where can the latest VxRail Pre-Installation Site Checklist be obtained for a new deployment?
- A. EMC Support VxRail
- B. SolVe
- C. Service offering index
- D. VxRail Master Knowledge Base article
Answer: A
NEW QUESTION # 202
Which series of VxRail nodes is designed to support a large MongoDB environment that is being used for data analytics?
- A. G Series
- B. V Series
- C. S Series
- D. P Series
Answer: D
NEW QUESTION # 203
A VxRail Manager VM must be configured as follows:
- IP address: 192 168.10.16
- Net mask: 255.255.255.0
- Gateway: 192 168 10 254
Which command must be used?
- A. vxrail-primary -config -vxrail-address 192.168.10 16 -vxrail-netmask 255 255 255 0 - vxrail-gateway 192.168,10 254
- B. vxrail-prrmary -config -ip 192 168 10 16 -netmask 255 255 255 0 -gateway 192 168 10 254
- C. vxrail-network -config -vxrail-address 192.166 10 16 -vxrail-netmask 255 255.255 0 - vxrail-gateway 192.168.10.254
- D. vxrail-network-config -ip 192 168 10.16-netmask 255.255.255.0-gateway 192 168 10.254
Answer: A
NEW QUESTION # 204
When using the RASR method to reset a VxRail node, which boot device is selected?
- A. SATADOM
- B. RASRUSB
- C. IDSDM
- D. IDRAC SD CARD
Answer: C
NEW QUESTION # 205
Which vSAN license includes entitlement for vROps 8 Advanced Services?
- A. Advanced
- B. Enterprise
- C. Enterprise Plus
- D. Standard
Answer: C
NEW QUESTION # 206
In addition to the VxRail YouTube video, links to what resources should the SE send to the customer, according to the VxRail PEQ Engagement Details worksheet?
- A. VxRail vCenter Server Planning Guide VxRail Network Guide
- B. VxRail vCenter Server Planning Guide Network Validation Tool
- C. VxRail QuickStart Guide Network Validation Tool
- D. VxRail QuickStart Guide VxRail Network Guide
Answer: C
NEW QUESTION # 207
A customer is running a 5-node VxRail all flash cluster with vSAN advanced licensing. They are unable to apply a RAID-6 Erasure Coding storage policy to the VMs.
What could be the cause?
- A. vSAN license level is incorrect and needs upgrading.
- B. Incorrect number of failure domains in the cluster.
- C. VxRail cluster only supports mirroring with an FTT of 1.
- D. RAID-6 Erasure Coding is only supported with stretched clusters.
Answer: B
NEW QUESTION # 208
An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches.
Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?
- A. show port-channel summary
- B. show interface status
- C. show network-policy profile
- D. show interface
Answer: A
NEW QUESTION # 209
A company is planning to deploy their Virtual Desktop Infrastructure on VxRail. The solution should support 2D and 3D high end visualization.
Which VxRail license is required for this solution?
- A. vSphere Standard
- B. vSphere Enterprise
- C. vSphere Enterprise Plus
- D. vSphere with Operations Management Enterprise
Answer: C
NEW QUESTION # 210
Where can an administrator find steps to perform a manual verification of the customer network?
- A. Pre-Engagement Questionnaire (PEQ)
- B. Dell Technologies SolVe Online
- C. Customer Simplified Form
- D. Dell EMC VxRail Network Planning Guide
Answer: B
NEW QUESTION # 211
After a successful installation, where in VxRail Manager should you collect logs?
- A. CONFIG > System > Log Collection > Diagnose
- B. CONFIG > General > System Diagnostics > Generate New Log Bundle
- C. CONFIG > System > System Diagnostics > Diagnose
- D. CONFIG > General > Log Collection > Generate New Log Bundle
Answer: A
NEW QUESTION # 212
How many cables are required to install a 4 node VxRail Model G410 cluster with 1 GbE into a rack?
- A. 20 CAT6 network cables
- B. 4 CAT6 and 8 Twinax network cables
- C. 4 CAT6 and 32 SFP+ connectors, and 16 fiber cables
- D. 4 CAT6 and 16 Twinax network cables
Answer: A
NEW QUESTION # 213
What is the maximum number of supported nodes in a VxRail Stretch Cluster?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION # 214
What network protocol is required for a VxRail Management VLAN?
- A. IPv6 Unicast
- B. IPv4 Unicast
- C. IPv4 Multicast
- D. IPv6 Multicast
Answer: D
NEW QUESTION # 215
What VxRail model is designed to support graphic intensive VDI workloads?
- A. S Series
- B. E Series
- C. V Series
- D. P Series
Answer: C
NEW QUESTION # 216
What is used to control remote access to VxRail through SRS?
- A. vCenter
- B. Policy Manager
- C. SRS VE Gateway
- D. VxRail Manager
Answer: B
NEW QUESTION # 217
What output logs are collected using the vc-support.sh script?
- A. vCenter log bundle
- B. ESXi log bundle
- C. vRealize Log Insight support bundle
- D. VxRail Manager log bundle
Answer: B
NEW QUESTION # 218
After finishing the rack and stack of a VxRail Model G410 cluster, in which sequence should the nodes be powered on?
- A. Any order possible
- B. Reverse order (4 - 1)
- C. All four at the same time
- D. Forward order (1 - 4)
Answer: B
NEW QUESTION # 219
Which activities must be completed as part of VxRail hardware installation?
- A. Verify existence of PSNT in the DCUI
Configure and use the default management network VLAN IDs
Confirm that the Port Group VLAN IDs are configured as intended - B. Verify the time setting on each node before the first-run process
Verify existence of PSNT in the DCUI
Confirm that the Port Group VLAN IDs are configured as intended - C. Configure iDRAC for remote accessibility to perform out of band system
Modify and configure the default management network VLAN IDs
Confirm that the external management VLAN ID is tagged - D. Confirm that the external management VLAN ID is tagged
Configure iDRAC for remote accessibility to perform out of band system
Verify the time setting on each node before the first-run process
Answer: B
NEW QUESTION # 220
You have been asked to install a 7 node VxRail single socket 1 GbE G Series cluster. The company has requested remote KVM support.
How many RJ45 cables will be required?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
NEW QUESTION # 221
A planned VxRail deployment will use an external vCenter Server and syslog server.
Which ping connectivity tests should succeed and which should fail before the deployment?
- A. Succeed: VxRail Manager and syslog server
Fail: vCenter server and ESXi hosts - B. Succeed: VxRail Manager and ESXi hosts
Fail: vCenter server and syslog server - C. Succeed: vCenter server and syslog server
Fail: VxRail Manager and ESXi hosts - D. Succeed: ESXi hosts and syslog server
Fail: VxRail Manager and vCenter server
Answer: A,C
NEW QUESTION # 222
......