Pass Your Exam With 100% Verified NCP-5.15 Exam Questions NCP-5.15 Dumps PDF - NCP-5.15 Real Exam Questions Answers What is the duration, language, and format of Nutanix NCP 5.15 Exam Passing score 80%This exam is offered in different languages such as English Japanese Simplified Chinese.This exam consists of 75 questionsThere is a time limit of 120 minutes for the exam.The type of questions are Multiple [...]

Pass Your Exam With 100% Verified NCP-5.15 Exam Questions [Q82-Q99]

Share

Pass Your Exam With 100% Verified NCP-5.15 Exam Questions

NCP-5.15 Dumps PDF - NCP-5.15 Real Exam Questions Answers


What is the duration, language, and format of Nutanix NCP 5.15 Exam

  • Passing score 80%
  • This exam is offered in different languages such as English Japanese Simplified Chinese.
  • This exam consists of 75 questions
  • There is a time limit of 120 minutes for the exam.
  • The type of questions are Multiple Choice.

The outcome for this test is three thousand using a scale system. The size is between 1000 and 6000. Scaled scores are determined using a statistical model that takes into account a series of variables, including the sum and nature of test questions used in the specific test edition. As this mix will vary in various implementations, scaled scores give everyone a decent grade, depending on the version of the test.


Introduction to Nutanix NCP 5.15

The 5.15 publication of the examination indicated the removal of 5.10. On September 15, 2020, the Nutanix NCP 5.10 exam will cease to be offered. On the other hand, you should only be confident that your scheduled date is before September 15, 2020, as you review and prepare for this edition of the test or that you are required to reset or move to a test at 5.15.

Different respectable organizations make massive efforts worldwide for the NCP-5.15 course. Nutanix is a well-known organization with tremendous technology investments. Nutanix has launched certifications Nutanix Certified Specialist that concentrates on a particular technology field. 5.15 Exam Certificates have an important role to play in the procurement of the new Nutanix Accredited Technical Technological Innovations Nutanix Accredited

Nutanix University is offering a course of the Nutanix certification which is for professionals it is an exam for which registrations are open. The new name of the exam is introduced because it covers different types of Nutanix technologies. It also highlights the different types of skills that will be used for earning after the certification of the course.

 

NEW QUESTION 82
A Nutanix administrator needs to replace a self-signed SSL certificate with a CA generated certificate in Prism.
Which three files are required to install the CA generated certificate in Prism? (Choose three)

  • A. Public Certificate (PublicCert.ker)
  • B. Public Server Key (public_server.key)
  • C. Certificate Signing Request (server.csr)
  • D. CA Certificate or Chain (ca_chain_certs.cer)
  • E. Private Server Key (private_server.key)

Answer: C,D,E

Explanation:
https://portal.nutanix.com/page/documents/details/?targetId=Prism-Central-Guide-Prism-v51:mul-security-ssl-certificate-pc-t.html

 

NEW QUESTION 83
An administrator has a 3-node cluster and needs to enable Erasure Coding on a container.
Which action must the administrator take before enabling this feature?

  • A. Convert the cluster to AHV
  • B. Stop workloads on the cluster
  • C. Upgrade to Prism Pro Licenses
  • D. Add a 4th node to the cluster

Answer: D

 

NEW QUESTION 84
A two-node ROBO cluster is configured with a witness VM.

What happens when Node A goes down?

  • A. All operations and services on the Node B are shut down and go into a waiting state.
  • B. The- cluster becomes unavailable and goes into read-only mode.
  • C. Node B sends a leadership request to the Witness VM and goes into single-node mode.
  • D. The cluster is unaffected and no administrator intervention is required.

Answer: C

 

NEW QUESTION 85
A node with Erasure Coding fails.
What is the impact?

  • A. Increased Controller VM CPU Load.
  • B. The node stops utilizing Erasure Coding.
  • C. Potentially increased amount of data stored in the SSD tier.
  • D. AQS unable to do deduplication during the Erasure Coding failure.

Answer: A

 

NEW QUESTION 86
An administrator responsible for a VDl environment needs to investigate reports of slow logins. The administrator finds that increasing the number of vCPUs from 2 to 4 will reduce the login times. Production workloads are consuming 75% of the host CPU on the cluster. The administrator increases the vCPU count on all of the VDl VMs.
What are two impacts on the cluster? (Choose two)

  • A. Increase memory utilization%
  • B. Increasing CPU counts will decrease memory utilization
  • C. Increase CPU ready%
  • D. Increase CPU utilization%

Answer: A,B

 

NEW QUESTION 87
Two HDDs fail simultaneously on a single AHV host.
What are the chances of data loss?

  • A. 25%
  • B. 0%
  • C. 100%
  • D. 50%

Answer: B

 

NEW QUESTION 88
An administrator is restarting a node and the CVM has not automatically restarted.
Which command should be used to start the CVM?

  • A. virsh start block-ID-(Node Letter)
  • B. virsh start cvm name
  • C. cvm start block-ID-(Node Letter)
  • D. cvm start cvm_name

Answer: B

 

NEW QUESTION 89
What are two minimum prerequisites for live migration to succeed? (Choose two.)

  • A. All AHV hosts must be configured on the same VLAN
  • B. All AHV hosts have IP addresses in the same subnet
  • C. All VMs have an IP address in the same subnet
  • D. All VMs are configured for the same VLAN

Answer: A,B

 

NEW QUESTION 90
Write I/O that is deemed sequential will enter which component of the Distributed Storage Fabric first?

  • A. Metadata Ring
  • B. Extent store
  • C. Oplog
  • D. Cache

Answer: B

 

NEW QUESTION 91
An Administrator is working on a one-node ROBO cluster configurations
Which statement is true for this configuration?

  • A. Supported hardware is NX-1175-G5 and G6
  • B. the minimum RPO 8 hours required
  • C. Witness vm required to break cluster quoram
  • D. witness vm should be 8vcp and 20gb ram

Answer: A

Explanation:
Reference:
https://www.nutanix.com/blog/unlocking-the-roboedge-it-landscape-with-the-launch-of-nutanix-1-node-cluster

 

NEW QUESTION 92
How should an administrator make sure that the LCM Framework is always up to date and upgraded to the latest version?

  • A. From the Life Cycle Management page in Prism Element, click Perform Inventory, then edit settings and set LCM Auto Inventory to Daily
  • B. From the Life Cycle Management page in Prism Central, click Perform Inventory, then edit settings and click the Enable LCM Auto Inventory checkbox
  • C. From the Life Cycle Management Perform Inventory every morning
  • D. From the Life Cycle Management page in Prism Element, click Perform Inventory, then edit settings and click the Enable LCM Auto Inventory

Answer: C

Explanation:
Reference: https://next.nutanix.com/how-it-works-22/nutanix-upgrade-order-37917

 

NEW QUESTION 93
which cli is used to run this command? (cluster version)

  • A. bash shell
  • B. ecli
  • C. acli
  • D. ncli

Answer: D

 

NEW QUESTION 94
Which command should an administrator run from the CLI to view the uplink state of all AHV nodes in the cluster?

  • A. allssh show_uplinks
  • B. manage ovs show uplinks
  • C. manage_ovs show_uplinks
  • D. allssh manage_ovs show_uplinks

Answer: D

 

NEW QUESTION 95
An administrator needs to shut down an AHV cluster to relocate hardware. The administrator upgrades NCC and runs health checks.
Which steps should the administrator perform next?
Item instructions: For each procedure, indicate the order in which that procedure must take place to meet the item requirements.

Answer:

Explanation:

Explanation


Reference:
https://next.nutanix.com/how-it-works-22/scheduled-power-outage-relocating-cluster-hardware-if-you-need-to-s

 

NEW QUESTION 96
An administrator installs Nutanix-specific PowerShell cmdlets. The cmdlets fail to run.
Which two requirements should the administrator verify first? (Choose two)

  • A. The cmdlets have the proper permissions
  • B. .Net Framework 4.0 is installed
  • C. PowerShell 2.0 or later is installed
  • D. Windows 2016 r2 or later is installed
  • E. Python 2.7 or greater is installed

Answer: B,C

 

NEW QUESTION 97
Which three configuration scenarios are valid for the deployment of Prism Central? (Choose three.)

  • A. Environments use Network Address Translation.
  • B. Prism Elements and Prism Central art in different subnets.
  • C. Environments use the 192.168.5.0/24 CVM management network.
  • D. Prism Elements and Prism Central have proxy configured.
  • E. Environments do not have Internet access.

Answer: A,C,E

 

NEW QUESTION 98
How should an administrator make sure that the is always up to date and upgraded to the latest version?

  • A. From the Life Cycle Management page in Prism Element, click Perform Inventory, then edit settings and set LCM Auto Inventory to Daily
  • B. From the Life Cycle Management page in Prism Element, click Perform Inventory, then edit settings and click the Enable LCM Auto Inventory checkbox
  • C. From the Life Cycle Management page in Prism Central, click Perform Inventory every morning
  • D. From the Life Cycle Management page in Prism Central, click Perform Inventory, then edit settings and click the Enable LCM Auto Inventory checkbox

Answer: C

 

NEW QUESTION 99
......

NCP-5.15 Dumps 100 Pass Guarantee With Latest Demo: https://www.guidetorrent.com/NCP-5.15-pdf-free-download.html