Pass SAP C-TS422-2021 Exam Quickly With GuideTorrent Prepare C-TS422-2021 Question Answers - C-TS422-2021 Exam Dumps C-TS422-2021 Exam Certification Details: Level:AssociateExam:80 questionsDuration:180 minsSample Questions: SAP C-TS422-2021 Exam Sample Question NEW QUESTION 35 What do you use to dispatch operations from planned orders so that the production plan can be fulfilled? A. Supply Network [...]

Pass SAP C-TS422-2021 Exam Quickly With GuideTorrent [Q35-Q54]

Share

Pass SAP C-TS422-2021 Exam Quickly With GuideTorrent

Prepare C-TS422-2021 Question Answers - C-TS422-2021 Exam Dumps


C-TS422-2021 Exam Certification Details:

Level:Associate
Exam:80 questions
Duration:180 mins
Sample Questions: SAP C-TS422-2021 Exam Sample Question

 

NEW QUESTION 35
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

  • A. Supply Network Planning (SNP)
  • B. Capacity Requirements Planning (CRP)
  • C. Material Requirements Planning (MRP)
  • D. Demand Planning (DP)

Answer: C

 

NEW QUESTION 36
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?

  • A. Work center
  • B. Production version
  • C. Plant
  • D. Material

Answer: A,D

 

NEW QUESTION 37
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple operations are maintained for one product
  • B. When multiple production versions are maintained for one product
  • C. When alternate resources are used within one operation
  • D. When multiple planned orders exist on one resource

Answer: C

 

NEW QUESTION 38
What are some uses for the low-level code assigned to each material?

  • A. it is used by ATP to determine the priority of alternative components.
  • B. It is used by product costing to determine how coast are rolled up.
  • C. It is used in MRP to determine the sequence in which materials are planned.
  • D. It is used by engineering to indentify subitems in an engineering bill of material (BOM).

Answer: B,C

 

NEW QUESTION 39
Why would you use phantom assemblies?

  • A. To reduce the number of changes required in bills of materials
  • B. To reduce the number of material masters
  • C. To simplify the structure of bills of materials
  • D. To increase the number of planning levels
  • E. To make the assignment of components easier

Answer: A,C,E

 

NEW QUESTION 40
What is the difference between co-products and by-products?

  • A. Only co-products can be manufactured in isolation from the main product.
  • B. Only co-products appear in the process or production order settlement rule.
  • C. Only co-products are identified by a special item category in the bill of material (BOM).
  • D. Only by-products have a zero inventory valuation.

Answer: B

 

NEW QUESTION 41
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Work item
  • B. Non-stock item
  • C. Variable-size item
  • D. WBS item

Answer: B,C

 

NEW QUESTION 42
What does forecasting in demand planning cycle include?

  • A. Market intelligence
  • B. Past quotation quantities
  • C. Past sales order quantites
  • D. Past procurment quantities
  • E. One-off events

Answer: A,C,E

 

NEW QUESTION 43
Which mhetods are available for goods issue posting of material components for process orders?

  • A. Transfer order
  • B. Blackflushing
  • C. Picking list
  • D. Kanban

Answer: B,C

 

NEW QUESTION 44
What is a work center hierarchy in planning in SAP S/4HANA?

  • A. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
  • B. A group of work centers in a production line being used in sequence for production
  • C. A group of alternative work centers for production, structured in hierarchy levels by priorities
  • D. A group of alternative work centers providing a cumulative available capacity for production.

Answer: D

 

NEW QUESTION 45
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

  • A. The work center has several invidula capacities.
  • B. The finite Scheduling indicator is NOT set in the strategy profile.
  • C. The Change Planning Direction indicator is set in strategy profile.
  • D. Alternative work centers are fully occupied.

Answer: A,B

 

NEW QUESTION 46
What type of time element can be reduced by strategy settings while dispatching?

  • A. Queue time
  • B. Transportation time
  • C. Setup time
  • D. Wait time

Answer: A,D

 

NEW QUESTION 47
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

  • A. Reduction of associated capacity requirements
  • B. Archiving of documents for assembly scrap
  • C. Posting of production costs to the production cost collector
  • D. Material staging for nex order in sequence
  • E. Posting of goods receipt for the product

Answer: A,C,E

 

NEW QUESTION 48
For what production type are production orders used?

  • A. Replenishment controlled by control cycles
  • B. Period and quantity-oriented production
  • C. Process manufacturing processes
  • D. Discrete manufacturing processes

Answer: D

 

NEW QUESTION 49
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  • A. Fill up to the reorder stock level
  • B. Fill up to the safety stoc level
  • C. Fill up to the maximum stock level
  • D. Fill up based on the lot size procedure

Answer: D

 

NEW QUESTION 50
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you deliver a sales order
  • B. When the MRP result are saved
  • C. When you create a sales order
  • D. When you create a planned order

Answer: C

 

NEW QUESTION 51
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP Concur
  • B. SAP Fieldglass
  • C. SAP Ariba
  • D. SAP Hybris
  • E. SAP SuccessFactors

Answer: A,B,C

 

NEW QUESTION 52
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?

  • A. Specify a negative offset time in the strategy profile.
  • B. Specify a positive planning horizon in the strategy profile.
  • C. Specify a negative lanning horizon in the strategy profile.
  • D. Specify a positive offset time in the strategy profile.

Answer: A

 

NEW QUESTION 53
What happens to this dependent requirement when you convert the planned order into a production order?

  • A. They are converted into a reservation.
  • B. They are converted into a schedule line.
  • C. They are converted into a production order.
  • D. They are converted into a planned order.

Answer: A

 

NEW QUESTION 54
......