ISTQB-CTFL PDF Dumps May 27, 2024 Exam Questions – Valid ISTQB-CTFL Dumps Ultimate ISTQB-CTFL Guide to Prepare Free Latest ISTQB Practice Tests Dumps NEW QUESTION # 45 Which ONE of the following statements about acceptance testing isNOTcorrect? A. The main goal of acceptance testing is to build confidence in the system, not find defects. B. Testing of disaster recovery and backup/restore is usually [...]

ISTQB-CTFL PDF Dumps May 27, 2024 Exam Questions – Valid ISTQB-CTFL Dumps [Q45-Q60]

Share

ISTQB-CTFL PDF Dumps May 27, 2024 Exam Questions – Valid ISTQB-CTFL Dumps

Ultimate ISTQB-CTFL Guide to Prepare Free Latest ISTQB Practice Tests Dumps

NEW QUESTION # 45
Which ONE of the following statements about acceptance testing isNOTcorrect?

  • A. The main goal of acceptance testing is to build confidence in the system, not find defects.
  • B. Testing of disaster recovery and backup/restore is usually NOT part of acceptance testing.
  • C. Acceptance testing is the last level of testing performed prior to system release.
  • D. The customers or system users are often responsible for the acceptance testing.

Answer: B

Explanation:
Acceptance testing is a level of testing performed to verify that a software product meets the agreed acceptance criteria and is acceptable for delivery. Acceptance testing is often performed by the customers or system users, who are the main stakeholders of the software product. The main goal of acceptance testing is to build confidence in the system, not find defects, as defects should have been detected and fixed in earlier levels of testing. Acceptance testing is the last level of testing performed prior to system release, unless there are any changes or fixes that require re-testing. Testing of disaster recovery and backup/restore is usually part of acceptance testing, as these are important aspects of system reliability and security that affect the customer satisfaction and trust. Therefore, statement A is not correct, while statements B, C and D are correct. Verified References: A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer, Chapter 2, page
20-21.


NEW QUESTION # 46
A Test Manager conducts risk assessment for a project. One of the identified risks is: The sub-contractor may fail to meet his commitment". If this risk materializes. it will lead to delay in completion of testing required for the current cycle.
Which of the following sentences correctly describes the risk?

  • A. It is a product risk since default on part of the sub-contractor may lead to delay in release of the product
  • B. It is no longer a risk for the Test Manager since an independent party (the sub-contractor) is now managing it
  • C. It is a product risk since any risk associated with development timeline is a product risk.
  • D. It is a object risk since successful completion of the object depends on successful and timely completion of the tests

Answer: A

Explanation:
* A product risk is a risk that affects the quality or timeliness of the software product being developed or tested1. Product risks are related to the requirements, design, implementation, verification, and maintenance of the software product2.
* The risk of the sub-contractor failing to meet his commitment is a product risk, as it could cause a delay in the completion of the testing required for the current cycle, which in turn could affect the release date of the product. The release date is an important aspect of the product quality, as it reflects the customer satisfaction and the market competitiveness of the product3.
* The other options are not correct because:
* A. It is not true that any risk associated with development timeline is a product risk. Some risks could be project risks, which are risks that affect the management or control of the software project, such as budget, resources, schedule, or communication1. For example, a risk of losing a key project stakeholder is a project risk, not a product risk.
* B. It is not true that the risk is no longer a risk for the Test Manager since an independent party is managing it. The Test Manager is still responsible for ensuring that the testing activities are completed according to the test plan and the quality objectives4. The Test Manager should monitor and control the sub-contractor's performance and communicate with him regularly to identify and mitigate any potential issues or deviations5.
* C. It is not clear what is meant by "object" in this option, but it could be interpreted as the software system under test or the test object6. In any case, the risk is not an object risk, as it does not affect the successful completion of the object, but rather the successful completion of the testing of the object. An object risk could be a risk that affects the functionality, reliability, usability, efficiency, maintainability, or portability of the software system under test2. For example, a risk of the software system having a high complexity or a low testability is an object risk, not a product risk.
References =
* 1 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 97
* 2 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 98
* 3 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 99
* 4 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 100
* 5 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 101
* 6 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 102


NEW QUESTION # 47
Consider the following testing levels:
1) Component Testing
2) Integration Testing
3) System Testing
4) Acceptance Testing
Which of the following statements is true?

  • A. Acceptance testing is applicable for all software development models.
    Component and system testing are applicable only for the V-model.
  • B. All testing levels are applicable, independent of which software development life-cycle process (V-model. iterative, incremental) is used.
  • C. Integration and system testing are applicable when V-model is used.
    Component and acceptance testing are applicable when iterative development models are used.
  • D. All the testing levels are applicable to V-model for software development.
    Only acceptance testing is applicable for iterative models.

Answer: B

Explanation:
All testing levels are applicable, independent of which software development life-cycle process (V-model, iterative, incremental) is used. Testing levels are defined based on the scope and objectives of testing, not on the software development model. Component testing, integration testing, system testing and acceptance testing are common testing levels that can be applied to any software development model, as long as they are planned and executed properly. The V-model is a software development model that emphasizes the relationship between each development phase and its corresponding testing phase. Iterative and incremental models are software development models that divide the development process into smaller cycles or iterations, where each iteration produces a working version of the software that can be tested and evaluated. Verified Reference: A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer, page 18.


NEW QUESTION # 48
Which of the following is an example of black-box dynamic testing?

  • A. Code inspection
  • B. Checking memory leaks for a program by executing it
  • C. Coverage analysis
  • D. Functional Testing

Answer: D

Explanation:
Functional testing is an example of black-box dynamic testing. Black-box testing (also known as specification-based testing) is a type of testing that does not consider the internal structure or implementation of the system under test, but rather its external behavior or functionality. Dynamic testing is a type of testing that involves executing the system under test with various inputs and observing its outputs. Functional testing is a type of black-box dynamic testing that verifies that the system under test performs its intended functions according to its requirements or specifications. Functional testing can be performed at various levels and scopes depending on the objectives and criteria of testing. The other options are not examples of black-box dynamic testing. Code inspection is an example of white-box static testing. White-box testing (also known as structure-based testing) is a type of testing that considers the internal structure or implementation of the system under test. Static testing is a type of testing that does not involve executing the system under test, but rather analyzing it for defects, errors, or violations of standards. Code inspection is a type of white-box static testing that involves examining the source code of the system under test for quality, readability, maintainability, etc.
Checking memory leaks for a program by executing it is an example of white-box dynamic testing. Memory leaks are defects that occur when a program fails to release memory that it has allocated but no longer needs.
Checking memory leaks for a program by executing it requires knowledge and access to the internal structure or implementation of the program, such as memory allocation and deallocation mechanisms, pointers, references, etc. Coverage analysis is an example of white-box static testing. Coverage analysis is a technique that measures how much of the code or structure of the system under test has been exercised by a test suite.
Coverage analysis requires knowledge and access to the internal structure or implementation of the system under test, such as statements, branches, paths, conditions, etc. Verified References: A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer, page 7.


NEW QUESTION # 49
Which of the following issues cannot be identified by static analysis tools?

  • A. Security vulnerabilities
  • B. Potentially endless loops
  • C. Very low MTBF (Mean Time Between failure)
  • D. Referencing a variable with an undefined value

Answer: C

Explanation:
Static analysis tools are software tools that examine the source code of a program without executing it. They can detect various types of issues, such as syntax errors, coding standards violations, security vulnerabilities, and potential bugs12. However, static analysis tools cannot identify issues that depend on the runtime behavior or performance of the program, such as very low MTBF (Mean Time Between failure)3. MTBF is a measure of the reliability of a system or component. It is calculated by dividing the total operating time by the number of failures. MTBF reflects how often a system or component fails during its expected lifetime. Static analysis tools cannot measure MTBF because they do not run the program or observe its failures. MTBF can only be estimated by dynamic testing, which involves executing the program under various conditions and collecting data on its failures4. Therefore, very low MTBF is an issue that cannot be identified by static analysis tools. The other options, such as potentially endless loops, referencing a variable with an undefined value, and security vulnerabilities, are issues that can be identified by static analysis tools. Static analysis tools can detect potentially endless loops by analyzing the control flow and data flow of the program and checking for conditions that may never become false5. Static analysis tools can detect referencing a variable with an undefined value by checking the scope and initialization of variables and reporting any use of uninitialized variables6. Static analysis tools can detect security vulnerabilities by checking for common patterns of insecure code, such as buffer overflows, SQL injections, cross-site scripting, and weak encryption. Reference = What Is Static Analysis? Static Code Analysis Tools - Perforce Software, How Static Code Analysis Works | Perforce, Static Code Analysis: Techniques, Top 5 Benefits & 3 Challenges, What is MTBF? Mean Time Between Failures Explained | Perforce, Static analysis tools - Software Testing MCQs - CareerRide, ISTQB_Chapter3 | Quizizz, [Static Code Analysis for Security Vulnerabilities | Perforce].


NEW QUESTION # 50
Which of the following statements is an example of testing contributing to higher quality?

  • A. A tester finds a bug which is resolved prior to release
  • B. A project manager asks to a test leader to estimate the test effort
  • C. A test leader writes a test summary report
  • D. A tester installs a test ten in the lest environment

Answer: A

Explanation:
The question is about identifying an example of testing contributing to higher quality. Quality is the degree to which a component, system or process meets specified requirements and/or user/customer needs and expectations1. Testing is the process consisting of all lifecycle activities, both static and dynamic, concerned with planning, preparation and evaluation of software products and related work products to determine that they satisfy specified requirements, to demonstrate that they are fit for purpose and to detect defects2.
Therefore, testing contributes to higher quality by verifying and validating that the software products and related work products meet the specified requirements, are fit for purpose and have no defects, or at least have a reduced number of defects. Testing also provides information about the quality of the software products and related work products to the stakeholders, who can make informed decisions based on the test results3.
Out of the four given statements, only option D is an example of testing contributing to higher quality, as it shows that testing has detected a defect (a flaw in a component or system that can cause the component or system to fail to perform its required function4) and that the defect has been resolved (fixed and confirmed) prior to release (delivery of the software product to the customer or end user). This means that testing has prevented a potential failure (an event in which a component or system does not perform a required function within specified limits) from occurring in the operational environment, and thus has improved the quality of the software product.
Option A is not an example of testing contributing to higher quality, as it is a reporting activity that summarizes the test results and evaluates the test objectives, but does not directly affect the quality of the software product or related work products. A test summary report is a document that records and communicates the outcomes of testing activities, including test completion criteria, test results, incident reports, test summary and evaluation, and lessons learned.
Option B is not an example of testing contributing to higher quality, as it is a planning activity that estimates the resources and time needed for testing activities, but does not directly affect the quality of the software product or related work products. A test effort estimate is an approximation of the amount of work and/or the duration of time required to perform testing activities.
Option C is not an example of testing contributing to higher quality, as it is a preparation activity that sets up the test environment (an environment containing hardware, instrumentation, simulators, software tools, and other support elements needed to conduct a test), but does not directly affect the quality of the software product or related work products. A test environment installation is a process of installing and configuring the test environment according to the test environment specification.
Reference:
1: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 10
2: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 11
3: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 12
4: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 13
5: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 13
6: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 77
7: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 78
8: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 79
9: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 80
10: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 81
11: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 82
12: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 83
13: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 84
14: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 85
15: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 86
16: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 87
17: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 88
18: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 89
19: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 90
20: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 91
21: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 92
22: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 93
23: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 94
24: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 95
25: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 96
26: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 97
27: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 98
28: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 99
29: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 100
30: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 101
31: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 102
32: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 103
33: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 104
34: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 105
35: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 106
36: ISTQB Certified Tester Foundation Level Syllabus 2018, Version 4.0, p. 107


NEW QUESTION # 51
The following part of a business process flow is specified; REPEAT (book a bill) UNTIL (User presses Cancel). How many test cases are necessary in order to achieve 100% branch coverage of the process flow?

  • A. 0
  • B. Infinite
  • C. 1
  • D. 2

Answer: D

Explanation:
To achieve 100% branch coverage of the process flow, we need to test both the true and false outcomes of the condition (User presses Cancel). Branch coverage is a type of structural testing that measures how many decision outcomes in a program have been executed by a test suite. Branch coverage can be used to assess the adequacy or completeness of a test suite.
To test the true outcome of the condition, we need a test case that simulates the user pressing Cancel after booking a bill. This test case will exit the loop and end the process flow.
To test the false outcome of the condition, we need a test case that simulates the user not pressing Cancel after booking a bill. This test case will repeat the loop and book another bill.
Therefore, we need at least two test cases to achieve 100% branch coverage of the process flow. One test case for each possible outcome of the condition.
Verified References: [A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer], Chapter 4, page 40-41.


NEW QUESTION # 52
Which of the following is correct with regards to debugging?

  • A. Debugging is intended to find as many defects as possible in the code
  • B. Debugging is considered part of the testing activities
  • C. Debugging is often performed by test engineers
  • D. Debugging identifies the cause of a failure

Answer: D

Explanation:
Debugging is the process of finding, analyzing and removing the causes of failures in software. Debugging is not considered part of testing, but rather a development activity that can involve testing. Debugging is not intended to find as many defects as possible, but rather to fix the specific failure that was observed. Debugging is usually performed by developers, not by test engineers. Verified Reference: A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer, Chapter 1, page 6.


NEW QUESTION # 53
For withdrawing money tram an Automated Teller Machine (ATM), the following conditions are required:
- The bank card is valid
- The PIN code is correct
- Money is available in the user's account
The following are some possible interactions between the user and the ATM:
- The entered card is invalid The card is rejected
- The PIN code is wrong The ATM asks for another PIN code
- The requested amount is more than available in the user's account: The ATM asks for another amount
- The requested amount is available in the user's account The ATM dispenses the money Which test design technique should be used to cover all possible combinations of the input conditions?

  • A. Decision table
  • B. Equivalence class partitioning
  • C. Boundary value analysis
  • D. Use case based testing

Answer: A

Explanation:
A decision table is a technique that should be used to cover all possible combinations of input conditions for withdrawing money from an Automated Teller Machine (ATM). A decision table shows combinations of inputs and/or stimuli (causes) with their associated outputs and/or actions (effects). A decision table consists of four quadrants: conditions (inputs), actions (outputs), condition entries (values) and action entries (results). A decision table can be used to test components that have multiple inputs and outputs that depend on logical combinations of conditions. For example, for testing the ATM, we can identify three input conditions: the bank card is valid, the PIN code is correct, and money is available in the user's account. We can also identify four output actions: the card is rejected, the ATM asks for another PIN code, the ATM asks for another amount, and the ATM dispenses the money. A decision table can show all possible combinations of these conditions and actions in a systematic way.
Use case based testing is not a technique that can cover all possible combinations of input conditions for withdrawing money from an ATM. Use case based testing is a technique that verifies that a software product or system meets its specified requirements or user stories by executing realistic scenarios or workflows. Use case based testing can be used to test components that have complex or dynamic interactions with users or other systems. For example, for testing the ATM, we can identify several use cases, such as withdraw money, check balance, transfer money, etc. Each use case can have one or more scenarios that describe the steps and outcomes of the interaction. However, use case based testing may not cover all possible combinations of input conditions, as some scenarios may be omitted or overlooked.
Boundary value analysis is not a technique that can cover all possible combinations of input conditions for withdrawing money from an ATM. Boundary value analysis is a technique that tests boundary values between partitions of equivalent data. Boundary values are values at the edge of an equivalence partition or at the smallest incremental distance on either side of an edge. Boundary value analysis can be used to test components that have input values that can be divided into partitions of equivalent data. For example, for testing the ATM, we can identify boundary values for the input amount, such as the minimum and maximum amount allowed by the system or the user's account. However, boundary value analysis may not cover all possible combinations of input conditions, as some conditions may not have boundary values or may not be related to input values.
Equivalence class partitioning is not a technique that can cover all possible combinations of input conditions for withdrawing money from an ATM. Equivalence class partitioning is a technique that divides the input data and output results of a software component into partitions of equivalent data. Each partition should contain data that is treated in the same way by the component. Equivalence class partitioning can be used to test components that have input values that can be divided into partitions of equivalent data. For example, for testing the ATM, we can identify equivalence partitions for the input amount, such as valid amount (within the range allowed by the system and the user's account) and invalid amount (outside the range allowed by the system or the user's account). However, equivalence class partitioning may not cover all possible combinations of input conditions, as some conditions may not be related to input values or may have more than two partitions. Verified Reference: [A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer], Chapter 4, page 34-46.


NEW QUESTION # 54
The following part of a business process flow is specified; REPEAT (book a bill) UNTIL (User presses Cancel). How many test cases are necessary in order to achieve 100% branch coverage of the process flow?

  • A. 0
  • B. Infinite
  • C. 1
  • D. 2

Answer: D

Explanation:
To achieve 100% branch coverage of the process flow, we need to test both the true and false outcomes of the condition (User presses Cancel). Branch coverage is a type of structural testing that measures how many decision outcomes in a program have been executed by a test suite. Branch coverage can be used to assess the adequacy or completeness of a test suite.
To test the true outcome of the condition, we need a test case that simulates the user pressing Cancel after booking a bill. This test case will exit the loop and end the process flow.
To test the false outcome of the condition, we need a test case that simulates the user not pressing Cancel after booking a bill. This test case will repeat the loop and book another bill.
Therefore, we need at least two test cases to achieve 100% branch coverage of the process flow. One test case for each possible outcome of the condition.
Verified Reference: [A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer], Chapter 4, page 40-41.


NEW QUESTION # 55
Which of the following statements about testware are correct?
I When closing the test activities, all the testware resources can be uninstalled and released II All the testware should be subject to Configuration Management III. The testware. at the end of the project, should be transferred to the organization responsible for maintenance IV The developers are responsible for the correct installation of the testware

  • A. II, IV
  • B. II, Ill
  • C. I, Ill
  • D. I, IV

Answer: B

Explanation:
Testware is a term that refers to all artifacts produced during the testing process, such as test plans, test cases, test scripts, test data, test results, defect reports, etc. The following statements about testware are correct:
II) All the testware should be subject to Configuration Management. Configuration management is a process that establishes and maintains consistency among work products throughout their life cycle. Configuration management applies to all testware, as it helps ensure their quality and consistency, track their changes and defects, control their versions and access rights, and link them to other artifacts.
III) The testware at the end of the project should be transferred to the organization responsible for maintenance. Maintenance testing is testing performed on a software product after delivery to correct defects or improve performance or other attributes. Maintenance testing requires testware from previous testing activities or phases, such as test cases, test data, test results, etc. Therefore, the testware at the end of the project should be transferred to the organization responsible for maintenance testing, such as support team or maintenance team. The following statements about testware are incorrect:
I) When closing the test activities, all the testware resources can be uninstalled and released. This statement is incorrect, as some testware resources may still be needed for future testing activities or phases, such as maintenance testing or regression testing. Therefore, when closing the test activities, some testware resources should be archived and stored for future use, while others can be uninstalled and released.
IV) The developers are responsible for the correct installation of the testware. This statement is incorrect, as the testers are responsible for the correct installation of the testware. The testers should ensure that they have access to all necessary testware resources and that they are installed and configured properly before starting the test execution. Verified Reference: A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer, Chapter 6, page 58-61.


NEW QUESTION # 56
Which of the following statements about estimation of the test effort is WRONG?

  • A. Experience based estimation is one of the estimation techniques.
  • B. Effort estimate can be inaccurate because the quality of the product under tests is not known.
  • C. Once the test effort is estimated, resources can be identified and a schedule can be drawn up.
  • D. Effort estimate depends on the budget of the project.

Answer: D

Explanation:
Effort estimate does not depend on the budget of the project, but rather on the scope, complexity, and quality of the software product and the testing activities1. Budget is a constraint that may affect the feasibility and accuracy of the effort estimate, but it is not a factor that determines the effort estimate. Effort estimate is the amount of work required to complete the testing activities, measured in terms of person-hours, person-days, or person-months2.
The other options are correct because:
A) Once the test effort is estimated, resources can be identified and a schedule can be drawn up, as they are interrelated aspects of the test planning process3. Resources are the people, tools, equipment, and facilities needed to perform the testing activities4. Schedule is the time frame and sequence of the testing activities, aligned with the project milestones and deadlines5.
B) Effort estimate can be inaccurate because the quality of the product under tests is not known, as it affects the number and severity of the defects that may be found and the rework that may be needed to fix them6. Quality is the degree to which the software product satisfies the specified requirements and meets the needs and expectations of the users and clients7.
D) Experience based estimation is one of the estimation techniques, which relies on the judgment and expertise of the testers and other project stakeholders to estimate the test effort based on similar projects or tasks done in the past. Experience based estimation can be useful when there is a lack of historical data, formal methods, or detailed information about the software product and the testing activities.
Reference =
1 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 154
2 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 155
3 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 156
4 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 157
5 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 158
6 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 159
7 ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 16
[8] ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 160
[9] ISTQB Certified Tester Foundation Level Syllabus v4.0, 2023, p. 161


NEW QUESTION # 57
What is 'Component Testing'?

  • A. Experience-based testing
  • B. Functional testing
  • C. A test level
  • D. Integration Testing

Answer: C

Explanation:
Component testing is a test level. A test level is a group of test activities that are organized and managed together based on some common characteristics or objectives. A test level can be defined based on various factors, such as the scope and target of testing, the phase and model of development, the stakeholders and roles involved in testing, etc. Component testing (also known as unit testing or module testing) is a test level that focuses on verifying the functionality and quality of individual software components (such as modules, classes, functions, methods, etc.). Component testing can be performed by developers or testers using various techniques and tools depending on the type and complexity of the components. The other options are not test levels. Integration testing is another test level that focuses on verifying the functionality and quality of groups of software components that interact with each other or with external systems. Functional testing is a type of black-box dynamic testing that verifies that the system under test performs its intended functions according to its requirements or specifications. Experience-based testing is a category of test design techniques that rely on the tester's knowledge and intuition to derive and select test cases based on their experience with similar systems, technologies, domains, risks, etc. Verified Reference: A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer, page 19.


NEW QUESTION # 58
Why is it important to select a test technique?

  • A. Selecting the right test technique in a given situation Increases the effectiveness of the test process Oy creating tests with higher chance of finding bugs.
  • B. There are usually loo many test cases that may be run on a system. Test techniques help reduce the number of tests.
  • C. Test techniques define the number of regression cycles, which in turn impact the project schedule.
  • D. The only way to test a software application is by using well proven test techniques.

Answer: A

Explanation:
Selecting the right test technique is crucial because different techniques are suited to different types of testing and can significantly increase the effectiveness of the testing process by creating tests that are more likely to find defects. While reducing the number of tests (A) and defining the number of regression cycles (D) are considerations in the testing process, they are not the primary reasons for selecting a test technique. The assertion that the only way to test a software application is by using well-proven test techniques (B) is too restrictive and does not acknowledge the adaptability required in testing to suit different contexts and objectives. Therefore, option C is the most comprehensive reason, as it focuses on the effectiveness and efficiency of testing, leading to the creation of high-quality tests that have a higher chance of finding bugs.


NEW QUESTION # 59
For withdrawing money tram an Automated Teller Machine (ATM), the following conditions are required:
- The bank card is valid
- The PIN code is correct
- Money is available in the user's account
The following are some possible interactions between the user and the ATM:
- The entered card is invalid The card is rejected
- The PIN code is wrong The ATM asks for another PIN code
- The requested amount is more than available in the user's account: The ATM asks for another amount
- The requested amount is available in the user's account The ATM dispenses the money Which test design technique should be used to cover all possible combinations of the in put conditions?

  • A. Decision table
  • B. Equivalence class partitioning
  • C. Boundary value analysis
  • D. Use case based testing

Answer: A

Explanation:
A decision table is a technique that should be used to cover all possible combinations of input conditions for withdrawing money from an Automated Teller Machine (ATM). A decision table shows combinations of inputs and/or stimuli (causes) with their associated outputs and/or actions (effects). A decision table consists of four quadrants: conditions (inputs), actions (outputs), condition entries (values) and action entries (results). A decision table can be used to test components that have multiple inputs and outputs that depend on logical combinations of conditions. For example, for testing the ATM, we can identify three input conditions: the bank card is valid, the PIN code is correct, and money is available in the user's account. We can also identify four output actions: the card is rejected, the ATM asks for another PIN code, the ATM asks for another amount, and the ATM dispenses the money. A decision table can show all possible combinations of these conditions and actions in a systematic way.
Use case based testing is not a technique that can cover all possible combinations of input conditions for withdrawing money from an ATM. Use case based testing is a technique that verifies that a software product or system meets its specified requirements or user stories by executing realistic scenarios or workflows. Use case based testing can be used to test components that have complex or dynamic interactions with users or other systems. For example, for testing the ATM, we can identify several use cases, such as withdraw money, check balance, transfer money, etc.Each use case can have one or more scenarios that describe the steps and outcomes of the interaction. However, use case based testing may not cover all possible combinations of input conditions, as some scenarios may be omitted or overlooked.
Boundary value analysis is not a technique that can cover all possible combinations of input conditions for withdrawing money from an ATM. Boundary value analysis is a technique that tests boundary values between partitions of equivalent data. Boundary values are values at the edge of an equivalence partition or at the smallest incremental distance on either side of an edge. Boundary value analysis can be used to test components that have input values that can be divided into partitions of equivalent data. For example, for testing the ATM, we can identify boundary values for the input amount, such as the minimum and maximum amount allowed by the system or the user's account. However, boundary value analysis may not cover all possible combinations of input conditions, as some conditions may not have boundary values or may not be related to input values.
Equivalence class partitioning is not a technique that can cover all possible combinations of input conditions for withdrawing money from an ATM. Equivalence class partitioning is a technique that divides the input data and output results of a software component into partitions of equivalent data. Each partition should contain data that is treated in the same way by the component. Equivalence class partitioning can be used to test components that have input values that can be divided into partitions of equivalent data. For example, for testing the ATM, we can identify equivalence partitions for the input amount, such as valid amount (within the range allowed by the system and the user's account) and invalid amount (outside the range allowed by the system or the user's account). However, equivalence class partitioning may not cover all possible combinations of input conditions, as some conditions may not be related to input values or may have more than two partitions. Verified References: [A Study Guide to the ISTQB Foundation Level 2018 Syllabus - Springer], Chapter 4, page 34-46.