[Dec-2023] Free C_TS4CO_2020 Exam Dumps to Improve Exam Score
2023 Realistic C_TS4CO_2020 Dumps Exam Tips Test Pdf Exam Material
SAP C-TS4CO-2020 certification exam is designed for individuals who want to validate their knowledge and skills in using SAP S/4HANA for management accounting. SAP Certified Application Associate - SAP S/4HANA for Management Accounting (SAP S/4HANA 2020) certification exam is intended for application associates who are responsible for the implementation and configuration of SAP S/4HANA for management accounting. C_TS4CO_2020 exam covers various topics such as cost center accounting, product cost planning, profitability analysis, material ledger, and more.
To earn the SAP C_TS4CO_2020 certification, candidates must pass a 180-minute exam that consists of 80 multiple-choice questions. C_TS4CO_2020 exam covers various topics related to SAP S/4HANA for management accounting, such as cost center accounting, product cost planning, profitability analysis, and internal orders. It is important to note that the exam is only available in the English language.
NEW QUESTION # 96
What can you specify when you create an activity type? There are THREE correct answers for this question
- A. The primary costs G/L account for internal activity allocation
- B. The valid sending cost center types
- C. The secondary costs G/L account for internal activity allocation
- D. The activity type category for allocation
- E. The valid receiving cost center types
Answer: B,C,D
NEW QUESTION # 97
Which process can you use to credit internal orders during period-end closing?
- A. Distribution
- B. Assessment
- C. Indirect activity allocation
- D. Periodic reposting
Answer: D
NEW QUESTION # 98
Independent from the cost object, which parameters are always contained in a costing variant? There are TWO correct answers for this question
- A. Valuation variant
- B. Transfer control
- C. Reference variant
- D. Costing type
Answer: A,D
NEW QUESTION # 99
Which scenarios can be covered by the costing run?
- A. Inventory cost estimate of all the materials in one plant
- B. Standard cost estimate of all the materials in all plants of a controlling area
- C. Current cost estimate of all the materials in all controlling areas
- D. Product cost collector cost estimate in one plant
Answer: B,C
NEW QUESTION # 100
What parameters can you set up when defining order types?
- A. Define document type.
- B. Define default parameters for master record fields.
- C. Define source structure.
- D. Allow revenue postings.
Answer: B,D
NEW QUESTION # 101
Which receiver must be allowed in the settlement profile of product cost collector?
- A. Material
- B. Order
- C. Cost center
- D. G/L Account
Answer: A
NEW QUESTION # 102
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled? Note: There are 2 correct answers to this question.
- A. The type of the addressed ledger must be an extension ledger.
- B. The type of the general ledger account must be primary cost/revenue or secondary cost.
- C. Costing-based Profitability Analysis must be active.
- D. Account-based Profitability Analysis must be active.
Answer: B,D
NEW QUESTION # 103
You are setting up a direct internal activity allocation in SAP S4/HANA.
What is valid receivers for the activity? Note: There are 3 correct answers to this question.
- A. Profit center
- B. WBS element
- C. Internal order
- D. General ledger account
- E. Sales order item
Answer: B,C,E
NEW QUESTION # 104
When you create a profit center, what company code(s) is it assigned to by default ?
- A. All company codes within the controlling area
- B. All company codes, irrespective of controlling area
- C. All company codes where profit center is activated
- D. All company codes within the operating concern
Answer: A
NEW QUESTION # 105
Which of the following statements best describe Product Cost by Order?
- A. It is used when you perform repetitive manufacturing
- B. It is used when full cost traceability is needed
- C. It is used when controlling by individual production lots or discrete quantities is needed
- D. It is recommended for products with a long production time
Answer: A,B
NEW QUESTION # 106
You perform a settlement with a primary cost account which is different from the cost account you used to post the original expense. Which object is a valid receiver for the settlement?
- A. Internal order
- B. WBS element
- C. Fixed Asset
- D. Cost center
Answer: C
NEW QUESTION # 107
How does SAP S/4HANA capture costs? Note: There are 2 correct answers to this question.
- A. Only primary costs are captured in general ledger accounts.
- B. Secondary costs are captured as secondary cost element, and not as general ledger accounts.
- C. All primary and secondary costs are captured by creating them as cost elements.
- D. Primary and secondary costs are captured in general ledger accounts.
Answer: C,D
NEW QUESTION # 108
Which object can you configure to offset overhead surcharges for a cost object? There are THREE correct answers for this question
- A. Profitability segment
- B. Business process
- C. Profit center
- D. Internal order
- E. Cost center
Answer: B,D,E
NEW QUESTION # 109
What are some of the unique attributes of an assessment cycle in Controlling? Note: There are 2 correct answers to this question.
- A. They transfer primary and secondary costs.
- B. They transfer only primary costs.
- C. They use a secondary cost element during transfer.
- D. They use the original cost element during transfer
Answer: A,C
NEW QUESTION # 110
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?
- A. Reference variant
- B. Costing version
- C. Transfer control
- D. Costing type
Answer: C
NEW QUESTION # 111
When you define assessment cycles for the period-end closing in overhead cost accounting, which object can you assign to the cycle segment?
- A. Allocation structure
- B. Template
- C. Settlement rule
- D. Costing sheet
Answer: A
NEW QUESTION # 112
How can you configure cycles for period-end allocation? There are TWO correct answers for this question
- A. Use different allocation rules within one segment
- B. Define allocation for the same cost center in multiple segments
- C. Create cycles that iterate with each other
- D. Assign several segments to a cycle
Answer: B,D
NEW QUESTION # 113
Which of the following values can be calculated using results analysis? 3 answers
- A. Work in progress
- B. Cost of sales
- C. Cost of goods manufactured
- D. Reserves for unrealized costs
- E. Gross margin
Answer: A,B,D