C_TS4CO_2021 Free Exam Study Guide! (Updated 82 Questions) C_TS4CO_2021 Dumps for SAP Certified Application Associate Certified Exam Questions and Answer NEW QUESTION # 35 You are implementing SAP S/4HANA and you want to run analytical reports off a single data model. Which statement best describes reporting in SAP S/4HANA? A. Reporting can be either broad and deep for analysis, or speedy and simple, [...]

C_TS4CO_2021 Free Exam Study Guide! (Updated 82 Questions) [Q35-Q57]

Share

C_TS4CO_2021 Free Exam Study Guide! (Updated 82 Questions)

C_TS4CO_2021 Dumps for SAP Certified Application Associate Certified Exam Questions and Answer

NEW QUESTION # 35
You are implementing SAP S/4HANA and you want to run analytical reports off a single data model. Which statement best describes reporting in SAP S/4HANA?

  • A. Reporting can be either broad and deep for analysis, or speedy and simple, but not both.
  • B. Reporting on data in real time is difficult, and complex to design.
  • C. Reporting on data is available in real-time at every level of detail.
  • D. Reporting analytical data is always done in a business warehouse system.

Answer: C


NEW QUESTION # 36
Which statements are relevant to the cost of sales accounting method in profitability management? Note:
There are 2 correct answers to this question.

  • A. It presents the costs and revenues information in a format that is ideal for conducting margin analyses.
  • B. It presents revenues, primary expenses, changes in stock, WIP, and capitalized activities.
  • C. It aims to summarize activity and situational change for a given organizational unit over a period of time.
  • D. It aims to match revenues for goods and services against sales-related expenses.

Answer: A,D


NEW QUESTION # 37
Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.

  • A. Result Analysis (RA) Version
  • B. Result Analysis (RA) key
  • C. Costing variant for preliminary costing
  • D. Variance variant

Answer: B,C


NEW QUESTION # 38
What does SAP/S4HANA select line-item-based data for costing based Profitability Analysis reports?

  • A. It select actual data from table CE2XXXX and plan data from CE3XXXX.
  • B. It select actual data from table ACDOCA and plan data from COSP.
  • C. It select actual data from table ACDOCA and plan data from ACDOCP.
  • D. It select actual data from table CE1XXXX and plan data from CE2XXXX.

Answer: D


NEW QUESTION # 39
You are configuring internal order settlement. What do you define which cost element should be settled, using either the original settlement cost elements?

  • A. Credit component (of the costing sheet)
  • B. Allocation structure
  • C. Settlement rule
  • D. Settlement profile

Answer: B


NEW QUESTION # 40
You are considering using commitment management with internal orders. What do you need to do in the configuration?

  • A. Activate commitment management in the controlling area, the order type, and in individual internal order master data.
  • B. Activate commitment management only in the controlling area.
  • C. Activate commitment management in both the controlling area and the order type.
  • D. Activate commitment management in both the version and the order type.

Answer: C


NEW QUESTION # 41
Which receiver must be allowed in the settlement profile of product cost collector?

  • A. G/L Account
  • B. Order
  • C. Cost center
  • D. Material

Answer: D


NEW QUESTION # 42
How does SAP S/4HANA capture costs? Note: There are 2 correct answers to this question.

  • A. Only primary costs are captured in general ledger accounts.
  • B. Primary and secondary costs are captured in general ledger accounts.
  • C. Secondary costs are captured as secondary cost element, and not as general ledger accounts.
  • D. All primary and secondary costs are captured by creating them as cost elements.

Answer: B,D


NEW QUESTION # 43
What parameters can you set up when defining order types?

  • A. Define document type.
  • B. Define default parameters for master record fields.
  • C. Define source structure.
  • D. Allow revenue postings.

Answer: B,D


NEW QUESTION # 44
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control? Note: There are 2 correct answers to this question.

  • A. The availability of funds according to tolerance limits
  • B. The availability of funds on period level
  • C. The availability of funds in object currency
  • D. The availability of funds using overall plan value

Answer: A,C


NEW QUESTION # 45
What are some of the unique attributes of an assessment cycle in Controlling? Note: There are 2 correct answers to this question.

  • A. They use a secondary cost element during transfer.
  • B. They transfer only primary costs.
  • C. They transfer primary and secondary costs.
  • D. They use the original cost element during transfer

Answer: A,C


NEW QUESTION # 46
What are some of the objectives of Profitability Analysis? Note: There are 2 correct answers to this question.

  • A. Provide the company with a detailed view of its financial statements by areas of responsibilities.
  • B. Allow the company to determine standard costs and revenues according to the period accounting method.
  • C. Provide the company with information on the performance of its market segments.
  • D. Allow the company to determine if the sales force achieved their contribution margin goals.

Answer: C,D


NEW QUESTION # 47
Which scenarios can be covered by one single costing run? Note: There are 2 correct answers to this question.

  • A. Standard cost estimate of all the materials in all plants of a controlling area
  • B. Current cost estimate of all the materials in all controlling area
  • C. Inventory cost estimate of all the materials in one plant
  • D. Product cost collector cost estimate in one plant

Answer: C,D


NEW QUESTION # 48
To which object can you settle an internal order using cost elements with cost element category 21 (internal settlement)? Note: There are 3 correct answers to this question.

  • A. Sales order item
  • B. Asset
  • C. WBS element
  • D. General ledger account
  • E. Network

Answer: A,C,E


NEW QUESTION # 49
Which field can you select for both reporting in costing based and account-based Profitability Analysis?

  • A. Cost element
  • B. Record type
  • C. Version
  • D. Value in Controlling Area Currency

Answer: C


NEW QUESTION # 50
What master data objects can you set up using time-based fields? Note: There are 2 correct answers to this question.

  • A. Activity type
  • B. Cost element
  • C. Statistical key figures
  • D. Cost centers

Answer: A,D


NEW QUESTION # 51
What do you need to setup in order to bring the values incoming sales orders into account-based Profitability Analysis?

  • A. A multi-valuation ledger
  • B. A new standard G/L ledger with exclusive usage of "Prediction"
  • C. An extension ledger of type "Simulation"
  • D. An extension ledger of type "Prediction and Commitment"

Answer: D


NEW QUESTION # 52
You are creating new activity type and want to maintain plan prices for a cost center. Which attribute must you configure in the activity type master record? Note: There are 3 correct answers to this question.

  • A. Valid cost center categories
  • B. Activity type category
  • C. Price indicator
  • D. CO version
  • E. Company code

Answer: A,B,C


NEW QUESTION # 53
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.

  • A. Sales order item
  • B. Profit center
  • C. WBS element
  • D. General ledger account
  • E. Internal order

Answer: A,C,E


NEW QUESTION # 54
What can you configure in the settlement profile? Note: There are 2 correct answers to this question.

  • A. Define a number range for settlement document.
  • B. Determine an overhead key.
  • C. Define document management parameters.
  • D. Determine whether settlement is required.

Answer: C,D


NEW QUESTION # 55
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.

  • A. Save with date key
  • B. Price for materials
  • C. Price updates
  • D. Costing sheet

Answer: A,C


NEW QUESTION # 56
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.

  • A. Availability control can check against plan values.
  • B. You can enter costs and revenues.
  • C. You can define tolerance limits for plan overspend.
  • D. You can plan multiple versions.

Answer: B,D