NEW QUESTION 35
What is the purpose of the usage list for equipment history? (Choose two)
- A. To track where the equipment was installed
- B. To display the list of previous equipment operators
- C. To display changes to history-related fields in an equipment master record
- D. To document the number of breakdowns for an object
Answer: A,C
NEW QUESTION 36
What happens when you set the system status in a maintenance order to technically completed (TECO)?
There are 2 correct answers to this question.
Response:
- A. The system sets a deletion indicator for outstanding reservations.
- B. The system posts costs to the target account assignment.
- C. The system sets a deletion indicator for purchase orders assigned to the maintenance order.
- D. The system sets a deletion indicator for outstanding purchase requisitions.
Answer: A,D
NEW QUESTION 37
You want to set up an external refurbishment process through subcontracting, using material requirements planning (MRP)? Which of the following must you set in the system?
Please choose the correct answer.
Response:
- A. The Special Procurement indicator in the material master record
- B. The Material Provision indicator for special stock in the refurbishment order header
- C. The Subcontracting flag for the refurbishment order type
- D. The Subcontracting flag in the refurbishment order header
Answer: A
NEW QUESTION 38
What does the structure indicator for a functional location determine? (Choose three)
- A. The number of hierarchy levels for a particular structure
- B. The functional location type
- C. The edit mask
- D. The functional location category
- E. The number of characters for each hierarchy level
Answer: A,C,E
NEW QUESTION 39
Your customer wants to subdivide the maintenance organization by production responsibility.
What do you use to designate the contact person for coordination between production and plant maintenance?
- A. Plant section
- B. Production cost center
- C. Work center
- D. Controlling area
Answer: A
NEW QUESTION 40
Your customer wants to assign maintenance orders to network activities automatically with the
Maintenance Event Builder (MEB).
Which of the following steps must you perform?
There are 2 correct answers to this question.
Response:
- A. Assign a network to a revision with revision type WPS-controlled.
- B. Assign a hierarchical task list to a notification.
- C. Set the define Transfer of Project or Invest Program indicator.
- D. Assign maintenance orders manually to a revision with revision type WPS-controlled.
- E. Assign the Reference PM/PS element to task list headers and network activities.
Answer: A,E
NEW QUESTION 41
Which is not the phase of corrective Maintenance
Please choose the correct answer.
Response:
- A. Control
- B. Notification
- C. Planning
- D. Base
Answer: D
NEW QUESTION 42
You have selected Confirmation Required in the control key for operations in a maintenance order. One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed? (Choose three)
- A. CNF
- B. CLSD
- C. CRTD
- D. TECO
- E. PCNF
Answer: B,D,E
NEW QUESTION 43
You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item.
How can a user override the automatic release of the order without creating a new order type?
- A. Set the Do Not Release Immediately indicator in planning data for the maintenance item.
- B. Set the Do Not Release Immediately indicator in the task list header.
- C. Select a maintenance activity type and set the Do Not Release Immediately indicator.
- D. Select a maintenance planner group and set the Do Not Release Immediately indicator.
Answer: A
NEW QUESTION 44
Name the data which is created during the monitoring, controlling, regulation and optimization of a technical process.
Please choose the correct answer.
Response:
- A. Document entry
- B. WAMP
- C. Measurement system
- D. Process control system
Answer: D
NEW QUESTION 45
Where do you define initial and subsequent buffers for the maintenance plan strategy?
- A. In the maintenance package for the maintenance strategy
- B. In the maintenance plan scheduling parameters
- C. In the maintenance item
- D. In the maintenance plan category settings
Answer: A
NEW QUESTION 46
Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?
- A. The system restarts the maintenance plan.
- B. The system retains the normal scheduled call dates.
- C. The system reschedules all previous scheduled call dates.
- D. The system fixes the next scheduled call date.
Answer: B
NEW QUESTION 47
A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?
- A. Create a new measuring point and change the measuring point from which the measurement reading was transferred.
- B. Create a new technical object to represent the new measuring point.
- C. Create a special measuring document and set the Counter Replacement indicator.
- D. Dismantle the old measuring point and create a new measuring point.
Answer: C
NEW QUESTION 48
What purpose does the maintenance planner group serve?
- A. It determines which maintenance call object the system generates for a due maintenance call.
- B. It represents a person or a group of persons who is responsible for maintaining task lists.
- C. It identifies a person or a group of persons who is responsible for planning maintenance activities for a number of technical objects.
- D. It identifies a person who is part of the main work center and who acts as the supervisor.
Answer: C
NEW QUESTION 49
When a user creates a notification or an order and enters a functional location as the reference object, you want the system to suggest the subordinate equipment automatically.
In addition to setting the reference object view in the order or the notification, what other settings must you make?
There are 2 correct answers to this question.
Response:
- A. Set the Single Installation indicator in the equipment master data record.
- B. Set the Equipment-Installation Allowed indicator in the Functional Location master data record.
- C. Set View Profiles for Technical Objects in Customizing.
- D. Set the Single Installation indicator in the Functional Location master data record.
Answer: B,D
NEW QUESTION 50
You are installing a new SC9000. Which procedure should be used to install and configure the system?
- A. Connect through the supplied proprietary serial cable to the serial port
- B. Connect through a null modem cable to the serial port
- C. Connect through the Dell Storage Manager Client
- D. Connect through the iDRAC port
Answer: A
NEW QUESTION 51
Which 64-bit server operating systems are compatible with the Dell Storage Manager (DSM) Client?
- A. Red Hat Enterprise Linux 6, Windows Server 2016, and Windows Server 2008 R2
- B. Windows Server 2008 R2, Red Hat Enterprise Linux 7, and Windows Server 2012 R2
- C. Windows Server 2008 R2, Windows Server 2012 R2, and Windows 2016
- D. Red Hat Enterprise Linux 6, Windows Server 2012 R2, and Windows Server 2008 R2
Answer: B
Explanation:
Explanation/Reference: https://www.dell.com/storagehelp/dellstorageclient/2016R2/en-us/GUID-EC463E3A-BEEA-4B81- BE1D-9F3A55C15C3C.html
NEW QUESTION 52
Under which conditions you can change stock information in the serial number manually.
There are 2 correct answers to this question.
Response:
- A. No plant has been entered
- B. No stock check is active
- C. Sterilization operation
- D. BOM active
- E. All active
Answer: A,B
NEW QUESTION 53
You need to set up the iDRAC IP address on an SC Series controller with the following details:
* IP address 192.168.0.160
* subnet mask 255.255.255.0
* gateway 192.168.0.1
Which commands should be used to complete this task?
ifconfig inet set eth0 ip 192.168.0.160
- A. ifconfig inet set eth1 netmask 255.255.255.0
ifconfig inet set eth1 gateway 192.168.0.1
controller ipconfig set eth0 ip 192.168.0.160 - B. controller ipconfig set eth0 netmask 255.255.255.0
controller ipconfig set eth0 gateway 192.168.0.1
platform bmc set ip 192.168.0.160 - C. ifconfig inet set eth0 netmask 255.255.255.0
ifconfig inet set eth0 gateway 192.168.0.1
ifconfig inet set eth1 ip 192.168.0.160 - D. platform bmc set netmask 255.255.255.0
platform bmc set gateway 192.168.0.1
Answer: D
NEW QUESTION 54
The view profile enables you to create a customized selection of tabs for use with technical objects.
Which Customizing step(s) must you perform to make a view profile available?
- A. Create the view profile for a particular screen group and then assign it to a functional location category or equipment category.
- B. Activate customized tabs for each equipment category or functional location category.
- C. Create the view profile and assign it to an object type.
- D. Create the view profile in the master record of either equipment or functional location.
Answer: A
NEW QUESTION 55
You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item.
How can a user override the automatic release of the order without creating a new order type?
- A. Set the Do Not Release Immediately indicator in planning data for the maintenance item.
- B. Set the Do Not Release Immediately indicator in the task list header.
- C. Select a maintenance activity type and set the Do Not Release Immediately indicator.
- D. Select a maintenance planner group and set the Do Not Release Immediately indicator.
Answer: A
NEW QUESTION 56
......