100% Real L4M2 dumps - Brilliant L4M2 Exam Questions PDF L4M2 Exam PDF [2024] Tests Free Updated Today with Correct 147 Questions NEW QUESTION # 85 Which of the following standards specifies requirements for a quality management system? A. ISO 14001:2015 B. ISO 22000:2018 C. ISO 27001 D. ISO 9001:2015 Answer: D Explanation:ISO 9001:2015 specifies requirements for a quality management system.ISO 14001:2015 [...]

100% Real L4M2 dumps - Brilliant L4M2 Exam Questions PDF [Q85-Q104]

Share

100% Real L4M2 dumps  - Brilliant L4M2 Exam Questions PDF

L4M2 Exam PDF [2024] Tests Free Updated Today with Correct 147 Questions

NEW QUESTION # 85
Which of the following standards specifies requirements for a quality management system?

  • A. ISO 14001:2015
  • B. ISO 22000:2018
  • C. ISO 27001
  • D. ISO 9001:2015

Answer: D

Explanation:
ISO 9001:2015 specifies requirements for a quality management system.
ISO 14001:2015 specifies the requirements for an environmental management system that an or-ganization can use to enhance its environmental performance. ISO 14001:2015 is intended for use by an organization seeking to manage its environmental responsibilities in a systematic manner that contributes to the environmental pillar of sustainability.
ISO 22000:2018 specifies food safety management systems - Requirements for any organization in the food chain ISO 27001 provides requirements for an information security management system.
LO 3, AC 3.1


NEW QUESTION # 86
What is the purpose of sending value engineering analysis to external suppliers?

  • A. To analyse the supply market
  • B. To standardise production processed
  • C. To improve the existing products
  • D. To improve early supplier involvement

Answer: D

Explanation:
Value engineering is often applied to new products or services. Early supplier involvement (ESI) is the involvement of a supplier in the product development process from a very stage in order to use the supplier's experience and expertise. ESI can bring cost reduction opportunities, process improvements, supply chain improvements and reduce supply risk. Both processes focus on development of new product or service. They tend to work the best if they are used together.
LO 3, AC 3.1 & AC 3.4


NEW QUESTION # 87
A consulting firm in London had previously had static budgets. They were set once and locked in for the year. This resulted in departments meeting their budgets early and doing virtually nothing the rest of the accounting period. To address this imbalance, the company tossed out the static budget and developed a new one for each department of the next 18 months. And each month, real sales figures are analyzed against the plan and the budget is adjusted accordingly. Then the company adds another month into the budgeting plan. What type of budget this company is using?

  • A. Activity-based budget
  • B. Incremental budget
  • C. Zero-based budget
  • D. Rolling budget

Answer: D

Explanation:
A rolling budget is continually updated to add a new budget period as the most recent budget period is completed. Thus, the rolling budget involves the incremental extension of the existing budget model. By doing so, a business always has a budget that extends one year into the future.
Think of continuous (rolling) budgets as waves rolling ashore on the beach. A new wave comes in each time, replacing the one that was there before. From a financial perspective, the wave is your budget, and the time between waves is longer! These reporting time frames can be monthly, quar-terly, yearly, etc.
An incremental budget is a budget prepared using a previous period's budget or actual performance as a basis with incremental amounts added for the new budget period.
Zero-based budgeting (ZBB) is a method of budgeting in which all expenses must be justified for each new period. The process of zero-based budgeting starts from a "zero base," and every function within an organization is analyzed for its needs and costs. Budgets are then built around what is needed for the upcoming period, regardless of whether each budget is higher or lower than the previous one.
Activity-based budgeting (ABB) is a system that records, researches, and analyzes activities that lead to costs for a company. Every activity in an organization that incurs a cost is scrutinized for potential ways to create efficiencies. Budgets are then developed based on these results.
Reference:
LO 1, AC 1.4


NEW QUESTION # 88
When devising a business case for purchasing a new copier, Maria analyses its whole-life costs as following:

Though cost generating activities are identified, she has not categorised the costs. What is the total value of copier's end of life costs?

  • A. $150
  • B. $75
  • C. $300
  • D. $450

Answer: A

Explanation:
Life cycle costing is a key asset management tool that takes into account the whole of life implications of planning, acquiring, operating, maintaining and disposing of an asset.
The process is an evaluation method that considers all ownership and management costs. These include;
- Concept and definition;
- Design and development;
- Manufacturing and installation;
- Maintenance;
- Support services; and
- Retirement, remediation and disposal costs.
End of life costs often comprise of decommissioning, removing and disposal costs. In the copier scenario, the end of life costs equal to removal cost, which is $150.
Reference:
- Life Cycle Cost Guidelines (dlgsc.wa.gov.au)
- CIPS study guide page 36-40
LO 1, AC 1.2


NEW QUESTION # 89
Department for Transport (DfT) needs to buy new locomotives to expand the capacity of trains fleet. In 2009, they were criticized for beginning the procurement "without any clear idea of how many trains would be needed, which routes they would run on and what form of power would be required". What should procurement manager of DfT do first to manage risk in making the specification?

  • A. Implement mitigating actions
  • B. Assess the potential risks
  • C. Identify the possible risks
  • D. Monitor the potential risks

Answer: C

Explanation:
There are 4 steps to risk managing process:
Step 1: Identify hazards
Step 2: Assess the risk
Once a risk has been identified, a risk assessment should be conducted.
You should carry out a risk assessment for any manual tasks identified as being hazardous, unless the risk is well known and you know how to control it. A risk assessment can help you determine, which postures, movements and forces of the task pose a risk, where during the task they pose a risk, why they are occurring and what needs to be fixed.
Step 3: Control the risk
The ways of controlling risks are ranked from the highest level of protection and reliability to the lowest, which is known as the hierarchy of control. You must always aim to eliminate the hazard, which is the most effective control.
Step 4: Review risk control
Control measures that have been implemented must be reviewed, and, if necessary, revised to make sure they work as planned and to maintain a work environment that is without risks to health and safety.
Source: WorkCover Queensland
Reference:
LO 3, AC 3.3


NEW QUESTION # 90
Datong is a defence and law enforcement equipment supplier. They are developing new product but largely concerns about the detailed specifications of components and the capability of supply market. Which of the following approach should Datong adopt in order to optimise the specification and shorten time to market?

  • A. Control the budget tightly
  • B. Early supplier involvement
  • C. Invite the supplier to tendering process
  • D. Request for quotation from potential suppliers

Answer: B

Explanation:
To improve production process and reduce supply risk, Datong should collaborate with suppliers early in procurement cycle. Collaborating with suppliers in this way is often referred as Early Supplier Involvement (ESI)
'Request for quotation from potential suppliers': Quotations should only be requested if the buyer know exactly what they need. In this scenario, Datong is not yet sure about the specifications of product's components, request for quotation is not a good idea.
'Mapping out business plan': A business plan, as defined by Entrepreneur, is a "written document describing the nature of the business, the sales and marketing strategy, and the financial back-ground, and containing a projected profit and loss statement." A business plan is not appropriate with improving production process and reducing supply risk.
'Budget controlling': Budget controlling largely concerns with dealing with budget variances. Tighter budget alone cannot lead to improved processes and fewer risks.
LO 3, AC 3.1


NEW QUESTION # 91
Royal Navy is preparing a through-life contract. They put to the contract a term on rectification of operational defects and planning and delivery of Fleet Time Support Periods. Which part of through-life requirement does this term belong to?

  • A. Customer support
  • B. Manufacture
  • C. Installation
  • D. In-service support

Answer: D

Explanation:
There are 6 main components of the through-life requirements of an asset: Design, Manufacture, Installation, In-service support, Decommission and disposal and Customer support.
Rectification of operational defects and planning and delivery of Fleet Time Support Periods are maintenance activities which belong to in-service support. You may have chosen Customer support. However, in through-life asset management context, customer support does not include maintenance services. Instead, it is the services that go along the stages of asset life. It may include consulting, communication and information exchange.

Source: Andrew Graves
Reference:
LO 3, AC 3.2


NEW QUESTION # 92
A procurement manager includes provision on recovery from natural disaster into a through-life specification. Some suppliers suppose that provision is unnecessary. Is procurement manager's action justified?

  • A. No, because this provision will incur unnecessary cost to supplier
  • B. Yes, because the regulations require contract to have recovery provision
  • C. Yes, because natural disaster may cause risks in organisation's supply chain
  • D. No, because with current technology, natural disaster can't disrupt supply chain.

Answer: C

Explanation:
Risks like natural disasters - fire, flood, or weather-related event, and cyber-attacks can disrupt the supply chain seriously. Threats and disruptions mean a loss of revenue and higher costs, which leads to a drop in profitability. And businesses can't rely on insurance alone because it doesn't cover all the costs and the customers who move to the competition. Risks must be identified early and supplier should have a plan that ensures continuous operations during disasters.
There are several steps many companies must follow to develop a solid business continuity plan. They include:
- Business Impact Analysis: Here, the business will identify functions and related resources that are time-sensitive. (More on this below.)
- Recovery: In this portion, the business must identify and implement steps to recover critical business functions.
- Organization: A continuity team must be created. This team will devise a plan to manage the disruption.
- Training: The continuity team must be trained and tested. Members of the team should also complete exercises that go over the plan and strategies.
Reference:
LO 3, AC 3.2


NEW QUESTION # 93
Which of the following is the structured approach for defining customer requirements and translating them into technical specification?

  • A. Quality function deployment
  • B. Thomas-Kilmann model
  • C. Kano model
  • D. Mendelow's matrix

Answer: A

Explanation:
Quality function deployment (QFD) is a method to transform qualitative user demands into quantitative parameters, to deploy the functions forming quality, and to deploy methods for achieving the design quality into subsystems and component parts, and ultimately to specific elements of the manufacturing process.
Kano model of excitement and basic quality (Kano et al, 1984; Berger et al, 1993; Matzler et al, 1996) brings a different perspective for the analysis of improvement opportunities in products and services because it takes in consideration the asymmetrical and non-linear relationship between performance and satisfaction. The Kano model classifies customers requirements in five categories: basic requirements, performance requirements, attractive requirements, indifferent requirements and reverse requirements.
Mendelow's Matrix is a tool that may be used by an organisation to consider the attitude of their stakeholders at the start of a project or when they are setting out strategic objectives.
The Thomas Kilmann model identifies two dimensions when choosing a course of action in a con-flict situation, these are assertiveness and cooperativeness. Assertiveness is the degree to which you try to satisfy your own needs. Cooperativeness is the degree to which you try to satisfy the other person's concerns.
Reference:
LO 1, AC 1.2


NEW QUESTION # 94
A procurement organisation is keen to encourage innovation available within the supply market in the execution of an upcoming significant contract opportunity. A team member suggests that the specification should define the performance indicators so that supplier's solution can be checked against them. Which of the following will enable the organisation to achieve this goal?

  • A. Using an outcome focused specification
  • B. Applying a precise performance framework
  • C. Establishing transparent selection criteria
  • D. Using an output focused specification

Answer: D

Explanation:
The buying organisation is keen to encourage innovation so they should use the outcome or output based specification. In an outcome-based specification, umbrella statements like 'good quality', 'ambient temperature', 'convenient way' are often used. This may confuse the suppliers, and it's hard to check the solution that supplier offers. On the other hand, ouput-based specifications often include measurable requirements. For example, a specification for air conditioning system states that the system should maintain the room temperature at 19-24 degrees Celsius. Therefore, output specification is more appropriate in this case.
Reference:
LO 3, AC 3.1


NEW QUESTION # 95
Which of the following statements is the best definition of 'value engineering?

  • A. Analysing perceived value after the product is available for sale
  • B. Building value into a new product from design stage onwards
  • C. Value achieved by an engineering department
  • D. Producing good value products right first time.

Answer: B

Explanation:
Value Engineering (VE) is concerned with new products. It is applied during product development. The focus is on reducing costs, improving function or both, by way of teamwork-based product evaluation and analysis. This takes place before any capital is invested in tooling, plant or equipment.
This is very significant, because according to many reports, up to 80% of a product's costs (throughout the rest of its life-cycle), are locked in at the design development stage. This is under-standable when you consider the design of any product determines many factors, such as tooling, plant and equipment, labour and skills, training costs, materials, shipping, installation, maintenance, as well as decommissioning and recycle costs.
LO 3, AC 3.4


NEW QUESTION # 96
Which of the following sources of information are considered as primary data? Select TWO that apply.

  • A. RFI
  • B. Reports in business magazines
  • C. Commercial publishers of market reports
  • D. The collection of data from surveying customers
  • E. The information about specific market sectors from trade associations

Answer: A,D

Explanation:
The aim of this question is to check students' understanding of different types of data. There are 2 types of data:
- Primary data is the collection of original or raw data which are generated from field research. In this case, only RFI and surveys from customers are considered as primary data.
- On the other hand, secondary data is public information that has been collected by others. It is typically free or inexpensive to obtain and can act as a strong foundation to any research project - provided you know where to find it and how to judge its worth and relevance. Examples of secondary data are government statistics, industry associations, trade publications, published market reports, etc.
Reference:
LO 1, AC 1.2


NEW QUESTION # 97
Which of the following are typically reasons why an organisation implements value analysis? Select TWO that apply:

  • A. To shape and manage supply market
  • B. To find cost reduction opportunities by optimising the components used
  • C. To determine the value of each component used
  • D. To provide an outline business case for the specification
  • E. To decide whether there will be sufficient surplus funds to reinvest in the business

Answer: C

Explanation:
Value analysis is a systematic review of the production, purchasing and product design processes to reduce overall product costs. This can be accomplished through a variety of activities, including the following:
- Designing products to use lower-tolerance parts that are less expensive
- Switching to lower-cost components
- Standardizing parts across product platforms in order to achieve volume discounts
- Altering production processes to minimize the amount of production cycle time, thereby reducing labor costs
- Introducing automation to strip labor costs out of the production process
- Altering product packaging to lower its cost while still protecting the product The process is not a wholesale attack on costs. Costs are only reduced when the result will not im-pact the perceived level of quality experienced by customers, or the level of customer satisfaction.
Reference:
LO 3, AC 3.4


NEW QUESTION # 98
In Kano model, which of the following types of requirement should be excluded from the product or service?

  • A. Performance requirements
  • B. Must-be requirements
  • C. Reverse requirements
  • D. Attractive requirements

Answer: C

Explanation:
Kano model of excitement and basic quality (Kano et al, 1984; Berger et al, 1993; Matzler et al, 1996) brings a different perspective for the analysis of improvement opportunities in products and services because it takes in consideration the asymmetrical and non-linear relationship between performance and satisfaction. The Kano model classifies customers requirements in three categories (figure 3):
a) Basic Requirements (or Must-be requirement). The basic requirements fulfill the basic func-tions of a product. If they are not present or their performance is insufficient, customers will be extremely dissatisfied. On the other hand, if they are present or have sufficient performance, they don't bring satisfaction. Customers see them as prerequisites. For instance, for luxury automobiles, "air bags" are considered basic. A customer won't feel satisfied if the automobile has "air bag", however he/she will not buy it if "air bag" is not present.
b) Performance Requirements (or One-dimensional requirements). As for these requirements, satisfaction is proportional to the performance level - the higher the performance, the higher the customer's satisfaction will be and vice-versa. Gas consumption in automobiles is an example of these requirements. Usually customers explicitly demand performance requirements.
c) Excitement Requirements (or Attractive requirements). These requirements are key to cus-tomer satisfaction. If they are present or have sufficient performance, they will bring superior satisfaction. On the other hand, if they are not present or their performance is insufficient, customers will not get dissatisfied. For instance, a surprise gift at the end of a dinner in a restaurant will certainly bring satisfaction, but it will not cause dissatisfaction if not offered. These requirements are not demanded nor expected by customers.
Two other types of requirements may be identified in the Kano model: neutral and reverse ones. Neutral requirements do not bring either satisfaction or dissatisfaction. Reverse require-ments bring more satisfaction if absent than if present.

Reference:
- Integrating Kano model and QFD for Designing New Products
- CIPS study guide page 171-172


NEW QUESTION # 99
Aldar Properties is a property developer in UAE. In last month, it spent $2,160 for 10 tons of steel. In this month, it had planned 10% increment in budget for steel comparing to last month. But the number of orders boosted and total spend on steel reached $1,992.1 while Aldar has imported 11 tons. What is the main cost driver of steel budget?

  • A. Price variance
  • B. Inflation
  • C. Both price and quantity variances
  • D. Quantity variance

Answer: A

Explanation:
In this question, you have to calculate price variance and quantity variance.
Last month, 1 tonne of steel costed $216. This month, the price decreases to $181.1. Price variance = (P1 - P2)*Q2 = ($216-$181.1)*11 = $383.9 Quantity variance = (Q1-Q2)*P1 = -$216 Price variance is greater than quantity variance, therefore, price variance is the main cost driver.
LO 1, AC 1.4


NEW QUESTION # 100
What is the document that defines the activities, deliverables and timelines a supplier must carry out during contract performance?

  • A. Framework agreement
  • B. Statement of work
  • C. Project initial document
  • D. Work instruction

Answer: B

Explanation:
Statement of Work (SoW) is the document that captures and defines all aspects of your project. You'll note the activities, deliverables and the timetable for the project. It's an extremely detailed document as it will lay the groundwork for the project plan.
Project Initial Document is an important document and should precede any specification writing project. It sets out the scope of the project and it is the team's mandate from senior management Work instructions are also called work guides, Standard Operating Procedures (SOPs), job aids or user manuals, depending on the situation. In any case, the purpose of work instructions is to clearly explain how a particular work task is performed.
Framework agreements are arrangements between one or more buyers and one or more suppliers that provide the terms governing contracts to be established for a certain period of time, in particular with regard to price and, where necessary, the quantity envisaged.
Reference:
LO 3, AC 3.1


NEW QUESTION # 101
Warwickshire Ambulance Service (WAS) is an NHS Trust. It operates throughout Warwickshire and the neighbouring areas. It has three core areas of activity, namely the provision of Emergency Ambulance Services, routine Patient Transport Services, and Logistic Medical Services. The agency is working towards higher service level through benchmarking. Which of the following is the benefit of benchmarking to WAS?

  • A. It will help WAS analyse the competitors in the industry
  • B. Benchmarking is a panacea for all WAS's problems
  • C. It will help WAS create performance standards derived from an analysis of the best in business
  • D. It helps WAS identify better ways to deliver service through a cookbook process

Answer: C

Explanation:
Benchmarking is 'the pursuit by organisations of enhanced performance by learning from the suc-cessful practices of others. Benchmarking is a continuous activity; key internal processes are adjusted, performance is monitored, new comparisons are made with the current best performers and further changes are explored. Where information about these key processes is obtained through a co-operative partnership with specific organisations (rather than via a third party such as an independently-maintained database), there is an expectation of mutual benefit over a period of time.


Reference:
- The Department of Navy Benchmarking Handbook: A system view
- CIPS study guide page 49-51
LO 1, AC 1.3


NEW QUESTION # 102
Honda of America Manufacturing is a well established automobile manufacturer. It purchases tens of thousands of materials and parts from suppliers, however, only few of them are strategic. To these suppliers, Honda's procurement manager requires them to send details of labour, materials, overhead cost and profit. However, the suppliers are reluctant to submit such confidential infor-mation. Is the procurement manager's action appropriate?

  • A. Yes, because the procurement manager can get a good insight from the market
  • B. Yes, because strategies can be introduced for reducing cost and improving the supplier relationships.
  • C. No, because no suppliers are willing to show sensitive information on their costs and profit.
  • D. No, because procurement manager should conduct life-cycle analysis

Answer: B

Explanation:
With strategic suppliers, the aim should be to work co-operatively with them to find ways of reducing costs to achieve a target cost. It is necessary to work with the suppliers in carrying out open book costing by having first persuaded them of the need to do it. Open book can be used to establish a Target Cost, a Compensation Event value and can eventually be used to ensure the payment of actual costs to an organization. A number of forms of contract cater for this functionality of which only the NEC goes to into any great depth of methodology.
If the suppliers worry about leak of confidential information, procurement team can suggest them to sign a non-disclosure agreement. The buying organisation should also comply with data protection regulations. The Employer / individual responsible for a project's costs should ultimately take a pragmatic and sensible approach with regard to commercially or personally sensitive data provided by the contractor. The primary goal of all open book cost management is to provide Employer comfort and security in the accuracy of commercial data; this effectively means striking a balance between undertaking full audits and blind faith.
Reference:
LO 1, AC 1.2


NEW QUESTION # 103
Which of the following bodies provides standards for the products and services in the US?

  • A. ISO
  • B. AFNOR
  • C. ANSI
  • D. BSI

Answer: C

Explanation:
ANSI is the American National Standards Institute. It is responsible for providing technical stand-ards in the US LO 3, AC 3.1


NEW QUESTION # 104
......

Verified & Correct L4M2 Practice Test Reliable Source Jan 23, 2024 Updated: https://www.guidetorrent.com/L4M2-pdf-free-download.html

CIPS L4M2 Exam Preparation Guide and PDF Download: https://drive.google.com/open?id=1MU8XJNQoiOAG6iMy6qsc99GKyPVkrcWN